PhotoDashboard
JBSA Photo Gallery
The 502d Civil Engineering Squadron conducted a Ribbon Cutting Ceremony for a 144 person dormitory at JBSA Lackland AFB on February 21, 2017. The $18 million dollar facility opened after a 30 month construction in September 2016 when active duty airman of the 24th AF, 25th AF, and the 502 Air Base Wing began moving in.
170221-F-YO447-1900.JPG Photo By: Andrew C. Patterson

JOINT BASE SAN ANTONIO-LACKLAND - The 502d Civil Engineering Squadron conducted a Ribbon Cutting Ceremony for a 144 person dormitory at JBSA Lackland AFB on February 21, 2017. The $18 million dollar facility opened after a 30 month construction in September 2016 when active duty airman of the 24th AF, 25th AF, and the 502 Air Base Wing began moving in.


DOWNLOAD PHOTO (0.28 MB)


This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at http://www.dimoc.mil/resources/limitations.html , which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.



Back to Gallery